Project HÄMERTEN - Elbe bridges Location Germany, Hämerten Client Planungsgesellschaft Schnellbahnbau Hannover-Berlin Services Preliminary and detailed design, call for tender, supervision of construction work, static and structural checking Processing time 1990 - 1996 Kind of building Two railway bridges Structural system River bridges: 3-span continuous beams, floodland bridges: multi-span continuous beams Cross section River bridges: trusses; floodland bridges: box girders Total length 812 m Span length River bridges: 66.90 m / 105.77 m / 66.90 m Floodland bridges: ca. 34 bis 45 m Foundation Flat foundations Material Steel, prestressed concrete, reinforce concrete Construction Method River bridges: plug-in construction; floodland bridges: cyclic movement, falsework Note 1st bridge for existing tracks |
![]() |
|||||
|