|
|
||||||||||||
|
|
||||||||||||
|
Project BERLIN / SPANDAU - Havel bridge Location Germany, Berlin-Spandau Client Eisenbahn Bundesamt, Aussenstelle Berlin Services Building superintendence, project management, static and structural checking Processing time 1994 - 1996 Kind of building Railway trough-bridge Structural system Three-span beam Cross section Trough-bridge with "orthotropic plate" Total length 172.5 m Span length 25.0 m - 71.2 m - 25.0 m Foundation Deep foundation Material Steel, reinforced concrete Construction Method Crane erecting, crane location during erecting on bored piles over water Note Prestressed anchored bearing at the bridge ends; Design: Gerkan, Marg & Partner with Schlaich, Bergermann & Partner |
![]() ![]() |
|||||
|