Project HAMBURG - Suederelbe bridge Location Hanseatic city of Hamburg Client Deutsche Bundesbahn, Bundesbahndirektion Hamburg Services Preliminary and detailed design, call for tender Processing time 1970 - 1979 Kind of building Railway bridge Structural system 3 continuous 3-span beam Cross section Trussed centre span Total length 340 m Span length 107.40 m - 125.61 m - 107.40 m Foundation Flat and deep foundation Material Steel, reinforced concrete Construction Method Welded box girder construction, field erection joints riveted Note Publication: Stier, Hafke, Spelzhaus, Wohlers: Die neue Eisenbahnbrücke über die Süderelbe in Hamburg als Beispiel einer Fachwerkmittelträgerbrücke; Stahlbau, 1977 H. 1, S. 1-12 H. 2, S. 45-52, H. 3, S. 85-91 |
![]() |
|||||
|