BERLIN - Britzer Damm
BERLIN - Congress hall Berlin
BERLIN - Mörschbridge
BERLIN - Sandkrug bridge
BERLIN - Suedostallee
BERLIN - Teltowkanal
BERLIN - Thaer street bridge
BERLIN - Tunnel Ortskern Britz
BREMEN - Overpass, A281
BRIESEN - Pedestrian bridge
DEGGENDORF - Danube bridge
DONAUSTAUF - Danube bridge
DUESSELDORF - Cable stayed bridges over railway tracks
DUESSELDORF - Rhine bridge family
DUESSELDORF - Subway construction
DUESSELDORF - Tunneling
EBERSWALDE - Kloster bridge
FINOWFURT - Eberswalde
FISCHERDORF - Danube bridge
Hamburg - 4th tube Elbe tunnel
HAMBURG - Flood protection structure
Hamburg - motorway cross Hamburg East
HAMBURG - Norderelbe bridge
HAMBURG - Suederelbe bridge
HAMBURG - Underpass Waltershofer Damm
HAMBURG - Viaduct Roedingsmarkt
HÄMERTEN - Elbe bridges
ITZEHOE Störbrücke
KAPPELN - Schlei bridge
MAGDEBURG - Waterways junction
METTLACH - Saar-Staustufe
MÜNCHEN - Isar bridge Gruenwald
REGENSBURG - Nibelungen bridge
RENDSBURG - Railway high bridge
STRALSUND - Greifswalder Chaussee
STRALSUND - Ziegelgrabenbridge
STRODEHNE - Havel bridge
TRANSRAPID
USEDOM - Underpass Bansin
WUPPERTAL - Suspension railway - column no. 100
 
Project
HAMBURG - Subway-bridge A(21) - viaduct Roedingsmarkt 1st construction stage: superstructures 1 - 3, 2nd construction stage: superstructure 4 - 10

Location
Germany, Hanseatic city of Hamburg

Client
Hamburger Hochbahn AG (HHA)

Services
Expert reports, preliminary and detailed design, call for tender, execution planning

Processing time
1996 - 1999

Kind of building
Subway bridges

Structural system
Arch supporting beam on concrete columns and 1-span beams on restrained steel columns

Cross section
Superstructure 2: trough bridge superstructure 1, 3 - 10: deck bridges

Total length
279.40 m

Span length
5.0 - 41.4 - 2x 30.9 - 16.7 - 5x 30.9 m

Foundation
Deep foundation

Material
Steel, reinforced concrete

Construction Method
Crane erecting

Note
The GRASSL consulting engineers get the services to plan and design the replace or maintain of the bridges in the Hamburg subway system by the HHA since 15 years.



 
last update: 08/19/2010
 
Competitions
Feasibility studies
Preliminary and detailed designs
Computer simulations
Static and dynamic calculations
Preparation of working drawings
Awards