Project
EBERSWALDE - Kloster bridge

Location
Germany, main road L 291 overpass Havel-Oder canal between Eberswalde and Oderberg

Client
Wasserstrassenamt Eberswalde

Services
Preliminary and detailed design, computer simulation
(bridge and traffic facilites)

Processing time
1997 - 1999

Kind of building
Road bridge

Structural system
Arch supported beam

Cross section
Composite plate

Total length
105 m

Span length
102.59 m

Foundation
Flat foundation

Material
Steel, reinforced concrete

Construction Method
Subassembly and plug-in with pontoon

Note
Skew crossing (53 gon), footway as outside lane of the arches



 
last update: 08/19/2010
 