Project TRANSRAPID General design of the steel-carriageway of the TRANSRAPID Location Testing line Client MVP-München Company for testing and designing magnetic suspension railways Processing time 1989 - 1996 Kind of building Steel carriageway Structural system 2-span continuous beam Cross section Trapezoid box girder Total length 2-span continuous beam: 61.92m to be linked to the needed length Span length 2 x 30.616 m Foundation According to the local circumstances Material Steel Construction Method Elevated carriageway Straight and curved Note Additional plannings: - Steel and composite carriageways at ground level - Transporter bridge - Fast and slow riding switch - Carriageway on bridges - Carriageway crossings |
![]() |
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|