Project
Bw Ru 11, Bridge in the course of the A 113

Location
Berlin

Services
Preliminary draft and concept, computer simulation, consultancy at placing, structural checking

Processing time
1996 - 2004

Kind of building
Viaduct

Structural system
Double-span girder as trough bridge

Cross section
Trough bridge with steel box section and reinforced concrete carriageway slab

Total length
149,30 m

Span length
66,50 m - 82,80 m

Foundation
Abutment : flat footing
Pier : deep foundation with in-situ concrete piles

Material
Superstructure : S355 J2G3 B35
Pier : S 235 J2G3 B25, B35
Abutment : B25

Construction Method
Segment construction method with the help of cranes





 
last update: 07/09/2010
 
Competitions
Feasibility studies
Preliminary and detailed designs
Computer simulations
Static and dynamic calculations
Preparation of working drawings