Project Bw Ru 11, Bridge in the course of the A 113 Location Berlin Services Preliminary draft and concept, computer simulation, consultancy at placing, structural checking Processing time 1996 - 2004 Kind of building Viaduct Structural system Double-span girder as trough bridge Cross section Trough bridge with steel box section and reinforced concrete carriageway slab Total length 149,30 m Span length 66,50 m - 82,80 m Foundation Abutment : flat footing Pier : deep foundation with in-situ concrete piles Material Superstructure : S355 J2G3 B35 Pier : S 235 J2G3 B25, B35 Abutment : B25 Construction Method Segment construction method with the help of cranes |
![]() ![]() |
|||||
|