Project WOLGAST - Peene bridge Location Germany,Wolgast, Peene bridge Wolgast overpass main road B111 over the stream Peene Client Strassenbauamt Stralsund Services Supervision of construction work, static and structural checking Processing time 1995 - 1999 Kind of building Road and railway bridge Structural system Flap balance bridge Cross section Box girder Total length 255.90 m Span length Lateral bridges: 52.00 m; flap: 43.50 m Foundation Flat and deep foundation Material Steel, reinforced concrete Construction Method Subassembly and crowling with pontoon Note Multi-crowling the old bridge with pontoon during construction time, Pre-condition for railway junction of the island Usedom |
![]() |
|||||
|