Project Norderelbe bridge - K6, alteration of the steel construction
Location Germany, Hamburg, motorway A7
Client Hanseatic city of Hamburg
Services Expert reports, preliminary and detailed design, call for tender, execution planning
Processing time 1981 - 1985
Kind of building Road bridge
Structural system Cable stayed deck bridge, centre span
Cross section "Orthotropic plate" 4 stringers
Total length 410 m
Total height 172 m
Foundation Deep foundation
Material Steel
Construction Method Welding box girder and plate girder construction with horizontal joining construction
Note With the alteration was achieved:
- expansion from 4 to 6 lanes
- extension of stiffness
- interchangeability of single cables
- better checking conditions of single cables and anchorings
|
 |

|
 |