Sieversbrücke over Teltowkanal, Rehabilitation, Strengthening, Berlin
Completion | 2017 |
Client | Wasserstraßen- und Schifffahrtsamt Berlin |
Task | Strengthening |
Building Type | Road bridge |
Building Location | Berlin |
Building Technique | Falsework / support structure |
Building Material Superstructure | Prestressed concrete |
Building Material Foundation | Prestressed concrete |
Building Area Size | 2.189,00 m² |
Building Overall Length | 77,50 m |
Construction Height | 2,62 m |
Construction Width | 28,90 m |
Supporting Structure Type | Integral bridge |
Support | Abutment and pillars / columns |
Distance Between Supports | 16.65 m + 44.25m +16.62 m |
Foundation | Driven foundation |
Services: Planning |
Basic Assessment Preliminary Design Detailed Design Planning for Approval Construction Planning Preparation of Tendering Structural Analysis Construction Drawings |
Services: Supervision |
Consultant Services for the Client |
Services: Verification |
Damage Analyses Calculations |
