Rethebrücke, Replacement, Hamburg
Completion | In progress |
Client | Hamburg Port Authority |
Task | Replacement |
Building Type | Road bridge |
Building Location | Hamburg |
Building Name | Rethebrücke |
Building Construction Creative Consulting | Prof. Bernhard Winking Architekten BDA, Hamburg |
Building Material Superstructure | Steel |
Building Material Foundation | Reinforced concrete |
Building Area Size | 2.520,00 m² |
Building Overall Length | 144,20 m |
Construction Height | 2,00 m |
Construction Width | 24,60 m |
Supporting Structure Type | Bascule bridge |
Support | Pivot bearing |
Distance Between Supports | 104.20 m |
Foundation | Special pile foundation |
Services: Planning |
Basic Assessment Preliminary Design Detailed Design Planning for Approval Construction Planning Preparation of Tendering Assistance for Tendering Visualisation |
Services: Supervision |
Construction Management Construction Supervision Technical Examination Health and Safety Coordination Consultant Services for the Client |
Awards | Special Mention Preis des Deutschen Stahlbaues 2018 Winner Ingenieurpreis des Deutschen Stahlbaues 2019 AIV Structure of the Year 2017 Finalist European Steel Bridge Award 2018 Shortlist Ulrich Finsterwalder Ingenieurbaupreis 2019 Winner German Design Award 2019 |
In Working Group with |
