Rotes Siel, bascule bridge, replacement, Emden
Completion | 2013 |
Client | Bau- und Entsorgungsbetriebe Emden (BEE) |
Task | Replacement |
Building Type | Road bridge |
Building Location | Emden |
Building Name | Bascule Bridge Rotes Siel |
Building Material Superstructure | Steel |
Building Material Foundation | Reinforced concrete |
Building Area Size | 140,00 m² |
Building Overall Length | 14,50 m |
Construction Height | 0,75 m |
Construction Width | 10,10 m |
Supporting Structure Type | Bascule bridge |
Support | Pivot bearing |
Distance Between Supports | 13.10 m |
Foundation | Drilled pile foundation |
Services: Planning |
Basic Assessment Preliminary Design Detailed Design Planning for Approval Construction Planning Preparation of Tendering Assistance for Tendering Structural Analysis Construction Drawings |
Services: Supervision |
Construction Management Construction Engineering and Documentation Construction Supervision Production and Quality Monitoring |
In Working Group with |
