Undercrossing Osterbekweg
Completion | 1995 |
Client | Hamburger Hochbahn AG |
Task | Replacement |
Building Type | Railway bridge |
Building Location | Hamburg |
Building Name | Undercrossing Osterbekweg |
Building Material Superstructure | Steel |
Building Material Foundation | Masonry |
Supporting Structure Type | Deck bridge |
Support | Abutment |
Distance Between Supports | 21.01 m |
Services: Planning |
Preliminary Design Detailed Design Planning for Approval Construction Planning Preparation of Tendering Assistance for Tendering Structural Analysis Construction Drawings |
