Theodor-Heuss-Brücke, Floodplain Bridge to the left of the Rhine River, New Construction, Düsseldorf

Completion

1956

Client

Landeshauptstadt Düsseldorf, Amt für Verkehrsmanagement, Abteilung Brücken, Tunnel und Stadtbahnbau

Task

New construction

Building Type

Road bridge

Building Location

Düsseldorf

Building Name

Theodor-Heuss-Brücke, Floodplain Bridge to the left of the Rhine River

Building Technique

Falsework / support structure, temporary accommodation frame

Building Material Superstructure

Steel composite

Building Material Foundation

Reinforced concrete, masonry

Building Area Size 10.844,00 m²
Building Overall Length 432,00 m
Construction Height 2,09 m
Construction Width 25,60 m
Supporting Structure Type

Cable supported structure

Support

Abutment, Pillars / Columns

Distance Between Supports

6 x 72.00 m

Foundation

Pile foundation

Services: Planning

Detailed Design

Planning for Approval

Construction Planning

Structural Analysis

Construction Drawings

Additional Services

Special Draft