B15, New Construction Bridge over the Mangfall and over the Mangfall-Channel

Completion

In progress

Client

Staatliches Bauamt Rosenheim, Konstruktiver Ingenieurbau

Task

New construction

Building Type

Road bridge

Building Location

Rosenheim

Building Name

B15, Bridge over the Mangfall and over the Mangfall-Channel

Building Technique

Temporary accommodation frame, cantilevering

Building Material Superstructure

Steel, steel composite

Building Material Foundation

Reinforced concrete

Building Area Size 2.233,00 m²
Building Overall Length 192,50 m
Construction Height 1,25 m
Construction Width 14,45 m
Supporting Structure Type

Cable-stayed bridge

Support

Abutment, Pillars / Columns

Distance Between Supports

44.50+103.50+44.50

Foundation

Drilled pile foundation, deep foundation

Services: Planning

Preliminary Design

Detailed Design

Planning for Approval

Construction Planning

Preparation of Tendering

Assistance for Tendering

Structural Analysis

Construction Drawings

Visualisation

Building Information Modelling

Services: Supervision

Construction Management

Construction Supervision

In Working Group with