Building Inspections according to DIN 1076 Stage 1, Execution of 11 Main Inspections and 41 Secondary Inspections in Hamburg

Completion

2011

Client

Freie und Hansestadt Hamburg, Landesbetrieb Straßen, Brücken und Gewässer (LSBG)

Task

Preservation

Building Location

Hamburg

Building Name

Building Inspections Stage 1

Building Construction Description

Complete main inspection according to DIN 1076 on 11 bridge structures with a surface area of 22,500 m². Construction materials are steel, reinfoced concrete and pre-stressed concrete. Secondary inspections according to DIN 1076 on 12 bridge structures with a surface area of 5,500 m² and 30 additional structures such as traffic sign bridges. All structures belong to the city of Hamburg.

 

Inspection protocolls with the program SIB-Bauwerke in its actual version.

 

Inspection of bridges over railway facilities, rural and urban roads as well as critital points of high traffic. Coordination and preparation of the required measures for example BETRA including traffic meetings.

 

Coordination and planning of measurement devices and vehicles such as mobile platforms, scaffoldings, ships and pontoons.

Services: Verification

Building Inspection