Motorway A1, 8-lane Extension between Interchange HH-Südost and Interchange Norderelbe, Overall Project, Replacement, Hamburg

Completion

In progress

Client

DEGES, Deutsche Einheit Fernstraßenplanungs- und bau GmbH, Bereich P3 / Abteilung T3

Task

Replacement

Building Type

Major project

Building Location

Hamburg

Building Name

8-lane Extension between Interchange HH-Südost and Interchange Norderelbe

Building Construction Description

8-lane extension between the existing interchange HH-Südost and the to be planned interchange Norderelbe. Planning task is the northern section over a total length of 5,27 km. 14 bridge constructions need to be replaced. A high-flyer with a length of 125 m as well as a trough with a length of 490 m are part of the new interchange Norderelbe.

Services: Planning

Preliminary Design

Detailed Design

Preparation of Tendering

Building Information Modelling

In Working Group with