Motorway A100, Section 14, New Construction, Berlin

Completion

2000

Client

Senatsverwaltung für Stadtentwicklung und Umwelt

Task

New construction

Building Type

Major project

Building Location

Berlin

Building Name

Motorway A100 , Section 14

Building Construction Description

New construction of a 6-lane section of the Berliner Stadtautobahn (city motorway).

 

The planning section includes the Tunnel Ortsteil Britz with ramps, noise protection walls and one pedestrian bridge as well as the new construction of the crossing connection lane A100-102 over the Teltowkanal.

 

The tunnel section has a length of 2,129.00 m with 1,713.00 m in an open construction method including ventilator buildings, operational buildings and water retaining areas.

 

The crossing constructions with a length of 435.00 m are build as prestressed concrete constructions and one composite framework structure.

 

The pedestrian bridge has span of 36.50 m as arch structure with a lower deck.

Services: Planning

Basic Assessment

Preliminary Design

Detailed Design

Construction Planning

Preparation of Tendering

Structural Analysis

Construction Drawings

Services: Supervision

Technical Examination

In Working Group with