Oberbaumbrücke, Combined Road and Tram Bridge with Subway Viaduct, Replacement, Berlin

Completion

1995

Client

Senatsverwaltung für Stadtentwicklung und Umwelt

Task

Replacement

Building Type

Road bridge

Building Location

Berlin

Building Name

Oberbaumbrücke

Building Construction Description

Original bridge consisted of an arch line across 7 fields, now arch line with a central truss frame

Building Material Superstructure

Steel, reinforced concrete, prestressed concrete

Building Material Foundation

Masonry

Building Area Size 4.185,00 m²
Building Overall Length 150,00 m
Construction Height 1,00 m
Construction Width 27,90 m
Supporting Structure Type

Frame structure

Support

Abutment, Pillars / Columns

Distance Between Supports

7.50 m + 16.00 m + 19.00 m + 23.00 m + 19.00 m + 16.00 m + 7.50 m

Foundation

Shallow foundation

Additional Services

Checking of the workshop drawings for the demolition, security and new construction

Static Constructive Checks

Dr.-Ing. Michael Mündecke