Railway Parallel to Greifswald, New Construction, Greifswald

Completion

2011

Client

Universitäts- und Hansestadt Greifswald, Tiefbauamt

Task

New construction

Building Type

Pedestrian bridge

Building Location

Greifswald

Building Name

Pedestrian bridge Fleischerwiese

Building Technique

Lifting / assembly of prefabricated parts

Building Material Superstructure

Steel

Building Material Foundation

Reinforced concrete

Building Area Size 63,40 m²
Building Overall Length 16,50 m
Construction Height 0,36 m
Construction Width 4,28 m
Supporting Structure Type

Arch with elevated deck

Support

Abutment

Distance Between Supports

15.85 m

Foundation

Driven foundation

Services: Planning

Basic Assessment

Preliminary Design

Detailed Design

Planning for Approval

Preparation of Tendering

Assistance for Tendering

Visualisation

Services: Supervision

Construction Management

Construction Engineering and Documentation

Construction Supervision

Production and Quality Monitoring

Services: Verification

Building Inspection