U5 extension to Pasing, Baulos 5 West-1, new construction, Munich

Completion

In progress

Client

Landeshauptstadt München, Baureferat

Task

New construction

Building Type

Subway tunnel

Building Location

München

Building Name

U5 extension to Pasing, Baulos 5 West-1, new construction, München

Building Technique

Dig-and-cast method, cut-and-cover method

Building Construction Description

Closed tunnel in cut and cover method using diaphragm walls and in open construction, subway station, culverts, shafts, staircases, slab tracks

Building Construction Creative Consulting

Allmann Sattler Wappner Architekten und Ingo Maurer Lichtplanung

Building Overall Length 1.100,00 m
Construction Width 40,00 m
Services: Planning

Basic Assessment

Preliminary Design

Detailed Design

Planning for Approval

Construction Planning

Preparation of Tendering

Assistance for Tendering

Structural Analysis

Construction Drawings

Additional Services

TGA planning, planning of traffic facilities at the surface incl. traffic routing during construction,engineering structures and structural design for interior space of subway station, interior planning subway station, planning of mass-spring system, planning of accoustics, engineering structures and structural design for canal construction, lighting design subway station