Peter-Bruckmann-Brücke over the Neckar River

Completion

2009

Client

Stadt Heilbronn, Amt für Straßenwesen, Technisches Rathaus

Task

New construction

Building Type

Road bridge

Building Location

Heilbronn

Building Name

Peter-Bruckmann-Brücke over the Neckar River

Building Technique

Cantilevering, lifting / assembly of prefabricated parts

Building Construction Creative Consulting

Henry Ripke Architekten, Berlin

Building Material Superstructure

Steel, steel composite

Building Material Foundation

Reinforced concrete

Building Area Size 2.558,00 m²
Building Overall Length 186,00 m
Construction Height 2,00 m
Construction Width 14,25 m
Supporting Structure Type

Cable-stayed bridge

Support

Abutment and pillars / columns

Distance Between Supports

43.50 m + 109.50 m + 33.00 m

Foundation

Drilled pile foundation

Services: Planning

Competitions

Visualisation

Competition Result

4th Place

In Working Group with