Master´s Thesis: Motorway A10, Extension of A10/A24 from Junction Neuruppin to Interchange Pankow, BW 75Ü2, Bridge in the Course of L17 across A10, Replacement, Oberkrämer

Completion

2018

Task

Replacement

Building Type

Road bridge

Building Location

Oberkrämer

Building Name

BW 75Ü2, Bridge in the Course of L17 across A10

Building Technique

Temporary accommodation frame

Building Material Superstructure

Steel composite

Building Material Foundation

Reinforced concrete

Building Area Size 765,00 m²
Building Overall Length 57,51 m
Construction Width 13,80 m
Supporting Structure Type

Deck bridge

Support

Abutment, Pillars / Columns

Distance Between Supports

28.67 m + 28.81 m

Foundation

Shallow foundation

Services: Planning

Building Information Modelling