Master´s Thesis: Underground Line U3 South Circle, Steel Viaduct A24a Mönkedammfleet, Maintenance, Hamburg

Completion

2018

Task

Maintenance

Building Type

Railway bridge

Building Location

Hamburg

Building Name

Steel Viaduct A24a Mönkedammfleet

Building Technique

Falsework / support structure, temporary accommodation frame

Building Material Superstructure

Steel

Building Material Foundation

Reinforced concrete

Building Area Size 365,00 m²
Building Overall Length 48,00 m
Construction Width 7,60 m
Supporting Structure Type

Deck bridge

Support

Abutment, Pillars / Columns

Distance Between Supports

16.00 m + 16.10 m + 16.30 m

Foundation

Deep foundation

Services: Planning

Building Information Modelling