Motorway A10, 8-Lane Extension between Interchange Nuthetal and Potsdam, Solar Noise Protection Walls, New Construction, Berlin

Completion

In progress

Client

DEGES, Deutsche Einheit Fernstra├čenplanungs- und bau GmbH

Task

Enlargement

Building Type

Major project

Building Location

Berlin

Building Name

Interchange Nuthetal to Interchange Potsdam, Motorway A10

Building Construction Description

This planning section includes the widening of the 6-lane motorway to 8 lanes under continued traffic with 6+0 traffic routeing.

 

The planning section of the motorway A10 proceeds in east-west direction between interchange Nuthetal and Potsdam. The section hast a length of approximately 9.7 km.

 

Constructions:

Three motorway bridges (reinforced concrete constructions), two railway bridges (one bowstring bridge and one steel composite frame structure) one pedestrian bridge (steel structure), noise protection walls (length 5,400.00 m, height up to 10.00 m), traffic sign bridges.

Services: Planning

Preliminary Design

Detailed Design

Construction Planning

Preparation of Tendering

Structural Analysis

Construction Drawings

Visualisation