U81, Section 1, New Construction of the Metropolitan Railway Bridge over the Nordkreuz in Düsseldorf

Completion

In progress

Client

Landeshauptstadt Düsseldorf, Abteilung Brücken, Tunnel und Stadtbahnbau

Task

New construction

Building Type

Railway bridge

Building Location

Düsseldorf

Building Name

U81, Metropolitan Railway Bridge over the Nordkreuz

Building Technique

Longitudinal launching on launching car, lifting / assembly of prefabricated parts

Building Construction Creative Consulting

Reinhart+Partner Architekten

Building Material Superstructure

Steel

Building Material Foundation

Reinforced concrete

Building Area Size 4.433,00 m²
Building Overall Length 441,18 m
Construction Height 6,60 m
Construction Width 11,85 m
Supporting Structure Type

Central girder

Support

Abutment and pillars / columns

Distance Between Supports

62.75 m to 81.94 m

Foundation

Shallow foundation, deep foundation

Services: Planning

Basic Assessment

Preliminary Design

Detailed Design

Planning for Approval

Construction Planning

Preparation of Tendering

Structural Analysis

Construction Drawings

Visualisation

In Working Group with