New Construction of the Metropolitain Railway Kölner Straße / Siegburger Straße (A 5 D) in Düsseldorf

Completion

2004

Client

Landeshauptstadt Düsseldorf, Amt für Verkehrsmanagement, Abteilung Brücken, Tunnel und Stadtbahnbau

Task

New construction

Building Type

Subway tunnel

Building Location

Düsseldorf

Building Name

Metropolitan Railway Kölner Str. / Siegburger Str. (A5D) in Düsseldorf

Building Technique

Shield method, dig-and-cast method

Building Material

Steel, reinforced concrete

Building Overall Length 1.735,00 m
Services: Planning

Preliminary Design

Detailed Design

Preparation of Tendering

Services: Supervision

Construction Supervision

In Working Group with