B7 Heinrich-Ehrhardt-Brücke, New Construction, Düsseldorf

Completion

1981

Client

Landeshauptstadt Düsseldorf, Amt für Verkehrsmanagement, Abteilung Brücken, Tunnel und Stadtbahnbau

Task

New construction

Building Type

Road bridge

Building Location

Düsseldorf

Building Name

Heinrich-Ehrhardt-Brücke

Building Technique

Temporary accommodation frame, longitudinal launching on launching car

Building Material Superstructure

Steel

Building Material Foundation

Reinforced concrete

Building Area Size 6.241,00 m²
Building Overall Length 177,00 m
Construction Height 1,85 m
Construction Width 39,00 m
Supporting Structure Type

Cable-stayed bridge

Support

Abutment, Pillars / Columns

Distance Between Supports

14.00 m + 30.00 m + 88.80 m + 30.00 m + 14.00 m

Foundation

Shallow foundation

Services: Planning

Basic Assessment

Preliminary Design

Detailed Design

Preparation of Tendering

Services: Supervision

Construction Supervision

Static Constructive Checks

Ingenieurbüro Grassl GmbH