Motorway A3 Frankfurt - Nuremberg, Flyover 2242, New Construction, Erlangen

Completion

2019

Client

Autobahndirektion Nordbayern, Sachgebiet 51

Task

New construction

Building Type

Road bridge

Building Location

Erlangen

Building Name

Flyover 2242

Building Technique

Longitudinal launching on launching track, lateral launching, lifting / assembly of prefabricated parts

Building Construction Creative Consulting

Firmhofer + Günther Architekten

Building Material Superstructure

Steel composite

Building Material Foundation

Reinforced concrete

Building Area Size 809,00 m²
Building Overall Length 70,00 m
Construction Height 0,70 m
Construction Width 12,85 m
Supporting Structure Type

Mixed arch system

Support

Fixed portal frame

Distance Between Supports

70.00 m

Foundation

Drilled pile foundation

Services: Planning

Basic Assessment

Preliminary Design

Detailed Design

Planning for Approval

Construction Planning

Preparation of Tendering

Structural Analysis

Construction Drawings

Additional Services

Visualisation