Motorway A1, Langerfeld Valley Bridge, New Construction, Wuppertal

Completion

1999

Client

Landesbetrieb Straßenbau NRW, Niederlassung Essen, Außenstelle Wuppertal

Task

New construction

Building Type

Road bridge

Building Location

Wuppertal

Building Name

Langerfeld Valley Bridge

Building Material Superstructure

Steel, steel composite

Building Material Foundation

Reinforced concrete

Building Area Size 11.876,00 m²
Building Overall Length 325,00 m
Construction Height 3,13 m
Construction Width 18,50 m
Support

Abutment, Pillars / Columns

Distance Between Supports

37.00 m + 6 x 42.00 m + 36.00 m bzw. 30.50 m + 6 x 42.00 m + 36.00 m

Foundation

Drilled pile foundation

Services: Planning

Detailed Design

Preparation of Tendering

In Working Group with