Completion

2010

Client

Freie und Hansestadt Hamburg - BSU

Task

Maintenance

Building Type

Road tunnel

Building Location

Hamburg

Building Name

1.- 3. Röhre Elbtunnel

Building Technique

Cast-in-place concrete , shield method, floating and lowering

Building Material

Reinforced concrete

Building Overall Length 3.200,00 m
Construction Width 41,70 m
Services: Planning

Construction Planning

Preparation of Tendering

Construction Drawings

Services: Supervision

Technical Examination

Health and Safety Coordination