Year of completion
2001
Type of intervention
New construction
Contracting authority
Senatsverwaltung für Stadtentwicklung und Umwelt
Description
New construction of a 6-lane section of the Berliner Stadtautobahn (city motorway). The planning section includes the Tunnel Ortsteil Britz with ramps, noise protection walls and one pedestrian bridge as well as the new construction of the crossing connection lane A100-102 over the Teltowkanal. The tunnel section has a length of 2,129.00 m with 1,713.00 m in an open construction method including ventilator buildings, operational buildings and water retaining areas. The crossing constructions with a length of 435.00 m are build as prestressed concrete constructions and one composite framework structure. The pedestrian bridge has span of 36.50 m as arch structure with a lower deck.
Location
Berlin
Services Grassl
Basic assessment, preliminary design, detailed design, planning for approval, construction planning, preparation of tendering, technical examination
Services provided by engineering consortium