Motorway A10, 8-lane extension between interchange Nuthetal and Potsdam

  • Home
  • Projects
  • A10, 8-streifiger Ausbau AD Nuthetal bis AD Potsdam

Year of completion

2020

Type of intervention

Enlargement

Contracting authority

DEGES

Description

This planning section includes the widening of the 6-lane motorway to 8 lanes under continued traffic with 6+0 traffic routeing. The planning section of the motorway A10 proceeds in east-west direction between interchange Nuthetal and Potsdam. The section hast a length of approximately 9.7 km. Constructions: Three motorway bridges (reinforced concrete constructions), two railway bridges (one bowstring bridge and one steel composite frame structure) one pedestrian bridge (steel structure), noise protection walls (length 5,400.00 m, height up to 10.00 m), traffic sign bridges.

Location

Berlin

Services Grassl

Preliminary design, detailed design, planning for approval, construction planning, preparation of tendering, visualisation