© Daniel Schwen, CC BY-SA 2.5, https://commons.wikimedia.org/w/index.php?curid=1648892
Year of completion
2002
Type of intervention
New construction
Contracting authority
Freie und Hansestadt Hamburg - BSU
Description
Ramp south: open trough structure, width 14.50 - 32.00 m Tunnel north and south in open construction method: box frame with sectional coverage by operational building, width: approximately 14.00 m Central tunnel: tunnel frame with lining segments diameter > 12.25 m
Location
Hamburg
Type of structure
Road tunnel
Construction method
Shield tunneling method
Total length
3.390,00 m
Construction width
14,20 m
Construction material
Reinforced concrete
Services Grassl
Basic assessment, preliminary design, detailed design, preparation of tendering, construction supervision
Services provided by engineering consortium