• Home
  • Projects
  • Wiedererrichtung Altstadtbrücke über die Neiße Görlitz

Altstadtbrücke over the Neisse river

Year of completion

2004

Type of intervention

New construction

Contracting authority

Stadtverwaltung Görlitz

Description

Deck bridge, orthotropic plate, KH = 1.12 m at peak, rise of the arch 4.61 m, construction width 8.80 m / 10.30 m, width between the railings in the centre: 8.50 m, at the abutment: 10.0 m

Location

Görlitz

Type of structure

Pedestrian bridge

Construction method

Temporary accommodation frame, longitudinal launching on launching track

Construction material of superstructure

Reinforced concrete, steel

Total length

82,50 m

Type of structural system

Arch with suspended deck

Span lengths

79,86 m

Construction height

1,00 m

Construction width

10,30 m

Architect

Schultz-Brauns & Reinhart Architekten und Stadtplaner BDA, München

Services Grassl

Basic assessment, preliminary design, detailed design, planning for approval, construction planning, preparation of tendering, static constructive checks: Dr.-Ing. Michael Mündecke

Services provided by engineering consortium