B51, Münster Bypass, Trough Structure Mauritz
Year of completion
In progress
Type of intervention
New construction
Contracting authority
Landesbetrieb Straßenbau NRW
Trough Structure Mauritz
Pedestrian Bridge Laerer Landweg
Pedestrian Bridge Pleistermühlenweg
Gantrie km 5+960km
Gantrie km 6+260km
Temporary Bridges
Location
Münster
Type of structure
Road trough
Construction method
Sealing slab and slurry wall construction method
Total length
900,00 m
Construction width
25,00 m
Construction material
Glas, reinforced concrete, steel
Architect
Dirk Gottfried
Services Grassl
conceptual design, design of traffic infrastructure, structural design
Preliminary design, detailed design, preparation of tendering, conceptual design of traffic infrastructure