B56, Viktoriabrücke

  • Home
  • Projects
  • B56, Viktoriabrücke, Bauabschnitte 1 + 2 Bonn

Year of completion

In progress

Type of intervention

Replacement

Contracting authority

Bundesstadt Bonn

Location

Bonn

Type of structure

Road bridge

Construction method

Lifting / assembly of prefabricated parts

Construction material of superstructure

Precast concrete, reinforced concrete, steel composite

Total length

93,50 m

Type of structural system

Mixed beam / plate system

Span lengths

27,05 m + 40,40 m + 25,58 m

Construction height

1,50 m

Construction width

23,75 m

Services Grassl

Basic assessment, preliminary design, detailed design, planning for approval, construction planning, preparation of tendering, assistance for tendering, conceptual design of traffic infrastructure, visualisation