Ice age meets modern age
connecting people
Federal Highway B15 is an important Bavarian north–south connection east of Munich’s metropolitan area. The construction of the western section of the Rosenheim ring road (Westtangente Rosenheim) reduces traffic in the town and increases the residents’ quality of life. The heart of the construction is the 192.5?m Aicherpark Bridge crossing both the Mangfall River and the Mangfall Canal.
paving the way
The flexible cable-stayed bridge was the best design for the difficult subsoil conditions. The subsoil, consisting of basin deposits, is a leftover from the ice age and prone to excessive settlement that had to be taken into account. The superstructure counters this problem by means of pylons clamped into the structure and traditional supports. Intelligent move. The entire construction can be lifted if required. The 50?m foundation elements are not visible yet crucial. Bored piles, drainage columns and displacement piles transfer the loads to the marine clay soil.
creating construction culture
The extradosed bridge with short pylons and shallow cables blends harmoniously into its environment. The structure does not steal the limelight from the tall trees nor from the buildings of the adjacent Aicherpark. The exterior longitudinal girders form a continuous visual band with the pylons. The cables are not anchored into consoles but into the inside of the girders, which creates a structurally, economically and visually durable construction. Ready for the next ice age.


Year of completion
In progress
Type of intervention
New construction
Contracting authority
Staatliches Bauamt Rosenheim
Location
Rosenheim
Type of structure
Road bridge
Construction method
Temporary accommodation frame, cantilevering
Construction material of superstructure
Reinforced concrete, steel, steel composite
Total length
192,50 m
Type of structural system
Cable-stayed bridge
Span lengths
44,50+103,50+44,50
Construction height
1,25 - 1,50 m
Construction width
14,45 m
Services
Preliminary design, detailed design, planning for approval, construction planning, preparation of tendering, assistance for tendering, construction management, construction supervision, visualisation, building information modelling
Services provided by engineering consortium

















Latest news about the project
Mangfall Bridge in Rosenheim
Virtual VHK lecture on 26 October 2021
At 6.15 p.m. on 26 October 2021, at the VHK career fair, Jacqueline Donner, a team leader of the Munich office, will deliver the (virtual) lecture ...
Weiterlesen … Mangfall Bridge in Rosenheim
Site visit to the Mangfall Bridge in Rosenheim
Together on site once more
On 21 July 2021, the Munich office attended a site visit to the Mangfall Bridge in Rosenheim ...
Weiterlesen … Site visit to the Mangfall Bridge in Rosenheim
Cantilevered construction with a mountain backdrop
Construction continues on the Mangfall Bridge in Rosenheim
The construction of the superstructure of the Mangfall Bridge in Rosenheim is making big steps forward …
Weiterlesen … Cantilevered construction with a mountain backdrop