• Home
  • Projects
  • A23 Bau-km 1+468, Ortsumgehung Itzehoe, BW 314.11

Motorway A23, bypass Itzehoe, construction 314.11

Year of completion

2012

Type of intervention

New construction

Contracting authority

Landesbetrieb Straßenbau und Verkehr Schleswig-Holstein

Location

Itzehoe

Type of structure

Road bridge

Construction method

Falsework / support structure

Construction material of superstructure

Prestressed concrete, reinforced concrete

Total length

49,40 m

Type of structural system

Deck bridge

Span lengths

24,70 m + 24,70 m

Construction height

1,25 m

Construction width

13,80 m

Services

Basic assessment, preliminary design, detailed design, preparation of tendering, assistance for tendering, static constructive checks: Prof. Dr.-Ing. Peter Mark, health and safety coordination, technical examination