Motorway A40, Neuenkamp bridge over the Rhine river
© Udo Görisch / TAKE IT MEDIA
Year of completion
In progress
Type of intervention
Replacement
Contracting authority
Hochtief Infrastructure GmbH
Location
Duisburg
Type of structure
Road bridge
Construction method
Cantilevering, incremental launching, lateral launching
Construction material of superstructure
Reinforced concrete, steel, steel composite
Total length
802,00 m
Type of structural system
Cable-stayed bridge
Span lengths
48,00m + 2x70,00m + 380,00m + 3x60,00m + 54,00m
Construction height
4,00 - 4,09 m
Construction width
68,25 m
Services Grassl
conceptual design, structural design
Planning for approval, construction planning
© Udo Görisch / TAKE IT MEDIA
© HOCHTIEF/Udo Görisch (Take it Media)
© HOCHTIEF/Udo Görisch (Take it Media)
© Udo Görisch/TAKE IT MEDIA
© Udo Görisch/TAKE IT MEDIA
© Keipke Architekten
Latest news about the project
Major progress on our construction site in Duisburg-Neuenkamp!
Insights into the work on the Neuenkamp Bridge over the Rhine River in Duisburg
Late last year, the first structure in the direction of Dortmund was opened to traffic. The demolition of the existing bridge is currently underway, and preliminary work for the construction of the second structure in the direction of Venlo is being carried out.
Weiterlesen … Major progress on our construction site in Duisburg-Neuenkamp!