Year of completion
In progress
Type of intervention
Replacement
Contracting authority
DB InfraGo AG
Description
Single-sided maintenance walkway with railing; on the opposite side, the railing and maintenance walkway of the adjacent mainline railway bridge are utilized.
Location
Hamburg
Type of structure
Railway bridge
Construction method
Longitudinal launching, lateral launching
Construction material of superstructure
Reinforced concrete, steel
Total length
55,80 m
Type of structural system
Vault / arch
Span lengths
52,50 m
Construction height
3,40 - 4,05 m
Construction width
11,40 m
Services Grassl
Detailed design, planning for approval, construction planning, preparation of tendering, assistance for tendering, verification analysis, feasibility studies, visualisation, building information modelling