Railway Bridge Südkanal

Year of completion

In progress

Type of intervention

Replacement

Contracting authority

DB InfraGo AG

Description

Single-sided maintenance walkway with railing; on the opposite side, the railing and maintenance walkway of the adjacent mainline railway bridge are utilized.

Location

Hamburg

Type of structure

Railway bridge

Construction method

Longitudinal launching, lateral launching

Construction material of superstructure

Reinforced concrete, steel

Total length

55,80 m

Type of structural system

Vault / arch

Span lengths

52,50 m

Construction height

3,40 - 4,05 m

Construction width

11,40 m

Services Grassl

Detailed design, planning for approval, construction planning, preparation of tendering, assistance for tendering, verification analysis, feasibility studies, visualisation, building information modelling