L291, Klosterbrücke
Year of completion
2014
Type of intervention
Replacement
Contracting authority
Wasserstraßen- und Schifffahrtsamt Eberswalde
Location
Eberswalde
Type of structure
Road bridge
Construction method
Longitudinal launching on launching car, floating
Construction material of superstructure
Reinforced concrete, steel composite
Total length
104,60 m
Type of structural system
Arch with elevated deck
Span lengths
102,74 m
Construction height
18,30 m
Construction width
15,00 m
Services Grassl
conceptual design, design of traffic infrastructure, static constructive checks, structural design, visualisation
Basic assessment, preliminary design, detailed design, planning for approval, conceptual design of traffic infrastructure, static constructive checks: Dr.-Ing. Andreas Schneider, visualisation