Motorway A7, Langenfelder Brücke
Year of completion
2018
Type of intervention
Strengthening
Contracting authority
DEGES
Location
Hamburg
Type of structure
Road bridge
Construction material of superstructure
Prestressed concrete, reinforced concrete
Total length
398,00 m
Type of structural system
Deck bridge
Span lengths
42,40 m + 54,00 m + 80,00 m + 61,10 m + 42,00 m + 67,00 m + 52,00 m
Construction height
2,62 m
Construction width
46,00 m
Services Grassl
conceptual design, damage analyses, health and safety coordination, monitoring, structural design, verification analysis
Preliminary design, detailed design, planning for approval, construction planning, preparation of tendering, health and safety coordination, verification analysis, damage analyses, monitoring
© DEGES / 3D-Visualisierung: V-KON.media | Trier
© Behörde für Wirtschaft, Verkehr und Innovation
© BMVI
© DEGES/Candeo