Year of completion
1976
Type of intervention
New construction
Contracting authority
Landeshauptstadt Düsseldorf
Location
Düsseldorf
Type of structure
Road bridge
Construction method
Cantilevering, lateral launching
Construction material of superstructure
Reinforced concrete, steel
Total length
591,00 m
Type of structural system
Cable-stayed bridge
Span lengths
5 x 51,55 m + 257,75 m + 75,00 m
Construction height
3,15 m
Construction width
35,00 m
Services Grassl
Basic assessment, preliminary design, detailed design, preparation of tendering, construction supervision, building inspection