Extension Rüschhalbinsel, expansion of the airbus landing strip

Year of completion

2005

Type of intervention

Partial renewal

Contracting authority

ReGe Hamburg

Client

Airbus Deutschland GmbH

Description

The construction contains the enclosure, ground filling and flood protection of the landing strip headland for the extension of the landing strip and the excavation of a new access canal including bank walls and an additional harbour. The extension of the landing strip with additional 309.00 m is carried out to the north in direction of the Elbe River. The landing strip headland reaches from the existing access to the Rüschhafen, to the tip of the Rüschhalbinsel and from there approximately 125.00 m into the Elbe River. The headland is filled up to NN+5.5 m. The jump of the elevation level from the landing strip to the ground of the Elbe River and Rüschhafen is carried by a bank wall construction. The new land is surrounded by flood control measures. A new access to the Rüschhafen was created, the entrance to the inland port extended with mooring areas and new boat launches installed. The new development includes the road construction and a dike defence path with asphalt pavement. Amount of wet soil to be moved: 300,000.00 m³ Foundation: The south eastern bank walls of the harbour is realised with the application of reinforced concrete sheet piles anchored with bored injection piles. The bank walls of the landing strip headland are mixed pile walls. The piles are anchored with tilting anchorage.

Location

Hamburg

Construction material

Reinforced concrete, steel

Services Grassl

, construction supervision