St2426 bridge over the Main river

Year of completion

In progress

Type of intervention

Replacement

Contracting authority

Freistaat Bayern

Location

Horhausen

Type of structure

Road bridge

Construction method

Falsework / support structure, longitudinal launching on launching car, lateral launching, floating

Construction material of superstructure

Prestressed concrete, reinforced concrete, steel composite

Total length

154,25 m

Type of structural system

Arch with elevated deck

Span lengths

12,60 m + 39,60 m + 100,00 m

Construction width

14,30 m

Services Grassl

Basic assessment, preliminary design, detailed design, planning for approval, construction planning, preparation of tendering, conceptual design of traffic infrastructure, health and safety coordination, economic efficiency calculation