Railway connection 6115, overcrossing Ferch Lienewitz over the motorway A10

  • Home
  • Projects
  • Strecke 6115, EÜ Ferch Lienewitz über die A10 Berlin

Year of completion

2010

Type of intervention

Replacement

Contracting authority

DEGES

Location

Berlin

Type of structure

Railway bridge

Construction method

Longitudinal launching on launching car, lateral launching

Construction material of superstructure

Reinforced concrete, steel

Total length

69,20 m

Type of structural system

Arch with elevated deck

Span lengths

68 m

Construction height

11,00 m

Construction width

7,40 m

Services Grassl

Basic assessment, preliminary design, detailed design, planning for approval, construction planning, preparation of tendering, visualisation