Construction 207.05 - B207n over the motorway A20
Year of completion
2006
Type of intervention
New construction
Contracting authority
Landesbetrieb Straßenbau und Verkehr Schleswig-Holstein
Client
Bundesrepublik Deutschland
Location
Lübeck
Type of structure
Road bridge
Construction method
Lifting / assembly of prefabricated parts
Construction material of superstructure
Reinforced concrete, steel composite
Total length
50,25 m
Type of structural system
Deck bridge
Span lengths
25,12m + 25,13m
Construction height
1,20 m
Construction width
15,25 m
Services
Preliminary design, detailed design, preparation of tendering, static constructive checks: Dipl.-Ing. Uwe Schmiedel, health and safety coordination
