L291, Klosterbrücke over the Havel-Oder Waterway, Replacement, Eberswalde

Completion

2014

Client

Wasserstraßen- und Schifffahrtsamt Eberswalde

Task

Replacement

Building Type

Road bridge

Building Location

Eberswalde

Building Name

Klosterbrücke

Building Technique

Longitudinal launching on launching track, floating

Building Material Superstructure

Steel composite

Building Material Foundation

Reinforced concrete

Building Area Size 1.335,00 m²
Building Overall Length 104,60 m
Construction Height 18,30 m
Construction Width 15,00 m
Supporting Structure Type

Arch with elevated deck

Support

Abutment

Distance Between Supports

102.74 m

Foundation

Shallow foundation

Services: Planning

Basic Assessment

Preliminary Design

Detailed Design

Planning for Approval

Visualisation

Static Constructive Checks

Dr.-Ing. Andreas Schneider