Motorway A3 Regensburg - Passau, Deggenau Main Bridge over the Danube River, Construction 147, Rehabilitation of Deck Rib Nb. 15, Renewal of the Lateral Drainage

Completion

2008

Client

Autobahndirektion Südbayern, Dienststelle Regensburg

Task

Maintenance

Building Type

Road bridge

Building Location

Deggendorf

Building Name

Deggenau Bridge over the Danube River

Building Technique

Temporary accommodation frame, cantilevering

Building Material Superstructure

Steel

Building Material Foundation

Reinforced concrete

Building Overall Length 435,00 m
Construction Height 4,30 m
Construction Width 34,30 m
Supporting Structure Type

Cable-stayed bridge

Support

Abutment, Pillars / Columns

Distance Between Supports

290.0 m + 145.0 m

Foundation

Drilled pile foundation

Services: Planning

Preliminary Design

Detailed Design

Services: Supervision

Construction Supervision

Services: Verification

Building Inspection

Calculations